Had a short meeting with both dierectors of the infrastructure department to discuss what we had learned from the 12 weeks of training.
Bid farewell to all the other staffs in Zaidun-Leeng and thanked them for all the patience they gave us and knowledge they could share with us.
Friday, June 25, 2010
Thursday, June 24, 2010
~24th June 2010~
Followed Mr. Law to landfill for the monthly site meeting at Sua Betong, Port Dickson, Negri Sembilan.
I also went to Bukit Palong landfill closure site for site inspection of works done on site.
I also went to Bukit Palong landfill closure site for site inspection of works done on site.
Wednesday, June 23, 2010
~23rd June 2010~
Did colouring and folding for a project's drawing before submission to the local authority.
Tuesday, June 22, 2010
~22nd June 2010~
Went to do site reconnaissance survery at Kota Damansara. A total of 3 locations have been surveyed:-
a) A stream that was proposed to be converted into a large main pond.
b) 2 ponds that to be desilted.
We took photos of the surroundings and identify any problems that might/will occur during construction.
a) A stream that was proposed to be converted into a large main pond.
b) 2 ponds that to be desilted.
We took photos of the surroundings and identify any problems that might/will occur during construction.
Monday, June 21, 2010
~21 June 2010~
Prepared the landfill site visits report for final report of Industrial Training.
Requested so informations about the landfill from Mr. Law and ask any questions about any uncertainties.
Requested so informations about the landfill from Mr. Law and ask any questions about any uncertainties.
Friday, June 18, 2010
~18th June 2010~
Followed Mr. Law to 3 landfill sites - Pajam, Bukit Palong and Sua Betong located in Negri Sembilan.
Thursday, June 17, 2010
~17th June 2010~
Went to a construction site at Taman Melawati to observe the hand-dug Caisson on a hill slope where is enaccessible by lage machines to do pilling.
Get to know how hand-dug Caisson is constructed with the method statement provided by GEOHAN Sdn. Bhd., a specialist in all types of pillings including hand-dug Caisson.
Get to know how hand-dug Caisson is constructed with the method statement provided by GEOHAN Sdn. Bhd., a specialist in all types of pillings including hand-dug Caisson.