Drew the cross-section of the detention pond using the levels surveyed by the surveyor and the proposed level on the same sheet of paper so as to able to calculate the volume of cut/fill.
Ir. Ng Keng Keong shared some knowledge about civil engineers and the society based on his experiences of being an engineer.
Monday, May 3, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment