Went through the layout plan of Sri Damansara Sector 'B' and calculated the total water supply demand for that area.
Divided the area into several sub-area so as to have a clearer picture of the actual location for tomorrow's site survey.
Studied through Mr. Law's pumphouse calculation report where used yield line design method to calculate the moment acting on the wall of the pumphouse.
Tuesday, April 27, 2010